Saturday, September 8, 2007
8 Sep
It has been a lot easier having eight aircraft again. We have so much more flexibility and we are able to keep aircraft off the schedule to fix minor problems before they get big. Out biggest challenge the last couple of days has been power dynes (a machine that is used to apply large amounts of torque to bolts). We only had two of the big ones we use for rotor heads and three days after we had to send one off for calibration the other one died. We were able to borrow one for a day from Balad to get two aircraft up, then within hours of sending it back we had two more aircraft that needed rotor heads taken off. In the rear we go for weeks without taking a head off but here it is an almost daily occurrence. We got one shipped to us this morning but now we are dealing with dust (can’t do the test flights). The last two days have been pretty bad with visibility down to less than a mile. It clears up some at night when the wind dies but within hours of the sun rising it is thick again. I just need a couple more days with J.R. to get him signed off but right now the phase aircraft (the one he has to fly to do the maneuvers) is at work stoppage waiting for a bushing to be made in Balad. I have been getting more sleep lately but right about the time the dust rolled in I developed a nice little head cold (coincidence probably). A head cold in the summer is no fun – it just doesn’t feel right. One thing about the dust – it keeps the temperature down.
Dust H 104 L 81
Tuesday, September 4, 2007
4 Sep
The last couple of days work has really slowed down (a good thing in the maintenance world). I switched to the swing shift (noon-midnight) which I like much better. I have been staying busy implementing the suggestions the accident investigation team had for us. It is always a good thing to have someone else come in and look at how you are doing things. They didn’t find anything that connected to 171 but they did show us some things that we should be doing and other things that we could do better. The investigation is still open but they finished up here and now engineers are going to look at the parts they shipped back. The focus is shifting towards the aft swashplate but it will be a couple of months before we know anything more. I am already feeling the urge to get back into flying missions but it will still be awhile since Brian has to go to nights first so he can stay current on NVGs. The statistics came out for our first full month of flying. As compared to the unit we replaced we have flown 33% more people, 92% more cargo in less than half the hours. It’s like I told them back in April – the Marine’s focus was on how many flight hours we could support but I said the goal is moving stuff not flying hours. So far they have done a good job of keeping us full. I got my computer back up and running but this whole internet thing is really getting me down. The second system still isn’t up and people are driving me nuts. I decided to take today off – my first since 12 Aug so maybe I will be more relaxed tomorrow. :)
Clear H 124 L 87
Friday, August 31, 2007
31 Aug
The last few days have been tiring. I have been flying quite a bit – two test flights a day for the last four days. I think I have already mentioned it but the hardest thing about flying is everything leading up to actually getting airborne. The nice thing about flying missions is that you only do it once and your day is pretty much over when you get back. The average test flight last between ½ to 1 ½ hours but form the time I start looking at the aircraft until I finish the paperwork after the flight it is easily between three and five hours. I’m not helping myself out either – I need to get back into the gym and going to bed earlier. I can see the effects because the last couple of days I haven’t been handling the heat as well. Brian made it back yesterday morning so that should help – we may go back to split shifts again. I have found I am not a morning person – I like sleeping in. J.R. started his official progression this morning with the pre-phase test flight on 169. The flight went well – I like teaching people. The second internet system should be up any day now – it is just a matter of getting the right computer configuration. Speaking of computers I may have to completely restore mine to get my TV tuner to work. Wendi and Betsy headed down to Seward yesterday for the weekend – I am very jealous but glad they get to do it.
Clear H 115 L 87
Thursday, August 30, 2007
Tuesday, August 28, 2007
28 Aug
Clear H 128(yes that is miserable to work in) L 78
Friday, August 24, 2007
23 Aug
We had the memorial service two days ago. It was very well done and a good way to honor the crew of Dry Ice 41. The chapel was packed with a lot of Marines all the way up to the General level. It was a nice way to show us that we are considered one of them. The guys did a really good job with the eulogies – Brian said it was the hardest thing he has ever had to do. The last few days I have found myself thinking about the crew more rather than less. I keep praying that God will give me the strength and wisdom to do everything I can to prevent this from happening to our unit again. We have had a bad run of maintenance problems over the last couple of weeks. In addition to the normal little things we have had problems with major components like rotor heads, aft shafts, engines and transmissions. It seems to be something new every night. It’s been awhile since we have had four aircraft launch without incident. Tonight we had three different problems – we were able to fix two but the third crew had to go to the backup. It makes for long days – I worked until
Clear H 111 L 84
22 Aug
It looks like I am done with night flying for awhile. It really helps to have two test pilots during the day – especially when we are rolling out phases every eight days. Getting an aircraft out of phase keeps you busy all day and even though I have done it many times it is not a good idea to jump from one aircraft to another doing test flight. You don’t have the time to research all the work that has been done so you end up missing things. So I am pulling out of the mission work to focus on maintenance, at least until we get another test pilot up. Brian and I split the day up which allows me to come in at lunch time and work until midnight. That way I am around when the missions launch to answer maintenance questions and do any test flights that need to be done prior to the mission. I just flew 174 back this evening from Al Asad. It has been up there for the past two weeks getting all the #2 flight control hydraulic components replaced. We hopped on one of our aircraft at
Clear H 110 L 80
Sunday, August 19, 2007
19 Aug
David
18 Aug
We are back into the flow but everything feels different. The guys don’t talk about what happened much except in reference to how this is going to change the way we do things. It’s not that people are afraid to talk it’s just that we all know the risks and in order to continue on you have to assume that what happened to others will not happen to you. That is why it is so important to figure out what happened. Our biggest fear as type A personalities is that there is something outside of our control. As pilots and crew-members we have confidence ( as misplaced as it may be) that we can handle any situation with the basic assumption that our aircraft will stay together. During my years as a maintenance test pilot I have encountered a lot of unusual problems but at the same time developed a strong trust in the Chinook’s ability to get me safely back on the ground. A known threat is always better than one unknown and right now what happened to 171 is a big unknown. The safety team from
Clear H 127 L 88
16 Aug
It’s times like these that I really wish I was a better writer. Anything I say seems so inadequate, but maybe that is true for many things in life. We experience everything in the context of our previous experiences so our ability to relate is necessarily limited. Maybe that is why I am having such a hard time processing what happened on the 14th. About
Clear H 124 L 91
13 Aug
The mission load has slowed down already. One of our biggest concerns coming over here was our maintenance being able to keep up with the mission load – I wasn’t anticipating the opposite problem this early. It is so much better to stay busy – time goes by faster and it gives you something to focus on. We are still trying to get the flight schedule worked out. I was shifting back and forth between days and nights but it looks like I am solidly on nights for awhile. I think it will work out pretty good with Jackie and Brian doing test flights in the day then I will be available on my nights off if it is critical to do a test flight at night. I will have to go to days sometime before the end of the month to give Jackie his check ride. Every evening I have been working on the internet stuff. We have all the lines run for both systems. Now it is a matter of getting all the lines pulled into the rooms, ends put on and all the switches hooked up. I got the first system reactivated so once Tony figures everything out we should be up an running. I haven’t been able to talk to Wendi much at all – I sure miss hearing her voice. I did get all the photos that I enlarged to hang on my walls. Now I am just waiting on the magnets to hold them up.
Clear H 124 L 90
Monday, August 13, 2007
10 Aug
Clear H 118 L 85
5 Aug
Dust H 117 L 92